Calculates subcategory-level risk scores for one or more facilities and returns the jobId of those results.

A subcategory-level risk score is a measurement of the risk posed to a facility due to climate change. For each facility, the operation returns both a score (a value between 1-100), a risk level (one of none, low, medium, high, red flag), and an indicators object that includes category-specific risk metrics. For example, this object includes rainfall intensity, very wet days, absolute wet days, historical flood frequency, and historical flood severity metrics for the Floods risk category.

The request body defines an object with two required parameters: m, which specifies the methodology version and facilities, which defines an array of objects.

Depending on the value specified for m, the th, s, and rcp parmaters may also be required.

📷

Batch Processing

Moody's RMS recommends that you calculate risk for mulitiple facilities in each request. Batch jobs are processed more efficiently than single job requests. No more than 500 facilities may be specified in each request.

Language
Authorization
URL